FIPs 36-40 Development Milestone Checklist

FIPs 36-40 Development Milestone Checklist

The milestone checklist tracks the development tasks that need to be completed prior to moving the Epic or story into a new status

Task

Deliverables

Notes

Task

Deliverables

Notes

Links

 

 

Github repo

 

see dev spec (add link)

Project wiki

 

see devspec (link)

Dev Epic

 

see epic (add link)

Requirements, Design, and Scoping

 

 

Meeting - Kickoff meeting

Kickoff meeting held with Product Manager to review requirements

 

Complete FIP (if applicable)

FIP reviewed and moved to Accepted status

 

Complete functional / technical design

Development Spec Design draft complete and saved to Development Documents (Active)

Design Draft should include a first draft of all elements outlined in the Development Spec.

Scoping

Create project stories
Estimate stories

Each story should be unit of work that is deliverable in a 2 week sprint. An initial estimate should be included with every story.

Design Review

 

 

Design review

Functional spec approved by architecture champions and team

 

Finalize FIP

FIP updated with any changes resulting from design review

 

Development

 

 

Project management

Maintain a public report that clearly shows:
  • Project milestones

  • Time estimates for reaching project milestones

 

RAM bumps for new actions

Determine RAM allocation for new actions and set RAM bump accordingly. This informationshould be added to the FIP.

See: https://developers.fioprotocol.io/docs/developers/ram

RAM usage TRNSLOCTOKS RAM Usage analysis

Fees for new actions

Estimate initial fees for all actions. In cases where the action requires additional RAM, the fees should be correlated with the RAM estimates. This informationshould be added to the FIP.

N/A for this project

Development branches

Project specific development branches created for:
fioprotocol/fio
fioprotocol/fio.contract
fioprotocol/fio.devtools
fioprotocol/fio.test
fioprotocol/fiosdk_typescript

Follow Git branching and naming practices at: https://developers.fioprotocol.io/docs/developers/git

 

Update FIP (or development document)

FIP / development spec updated to reflect the details of the implementation

 

ABI validation

Validate json for any new ABIs or ABIs that have been updated
If deploying new contract, make sure ABI copy command is in fio.devtools contracts/build.sh

json verified in ABI for clrgenlocks

Code review

Code reviewed with dev team

in progress

Unit Testing

 

 

Action and getter testing

fio.test enhanced with initial action and getter tests
Tests run cleanly

 

Performance testing

First level performance testing results reviewed with architecture champions (can be performed on dev machine, try to uncover any obvious perf limits)

in progress add story

System testing

Tests passed to QA for system testing

 

UAT

 

 

Merge to develop and install on DEV

Rebase feature branch and merge to develop for UAT testing
Install release on DEV server

 

Feature complete

All bugs and outstanding items completed
Work with QA to confirm JS tests run cleanly against DEV server

 

Product signoff

Signoff from Product Management

 

Release Plan

 

 

Rollout planning

Create rollout/release plan for this effort (added actions, removed actions, table migrations, order dependent detailed instructions on how to roll out these changes successfully. include all necessary MSIGs)
Detailed instructions on how to verify that the rollout was performed successfully
Review the rollout plan and verification with architecture and QA/Integration teams

in progress

Devnet

 

 

Devnet testing

Work with release engineer to fully test any new contracts and actions.

Devnet testing is tracked in the Release Milestone Checklist

Testnet

 

 

Test planning

Work with release team to ensure correct Testnet rollout (addaction, setfee, contract updates, etc).

See Release Milestone Checklist

Testnet rollout verification

Perform the Testnet rollout verification for the feature and report findings (add results to Dev Spec)

 

Mainnet

 

 

Test planning

Work with release team to ensure correct Mainnet rollout (addaction, setfee, contract updates, etc).

See Release Milestone Checklist

Mainnet rollout verification

Perform the Mainnet rollout verification for the feature and report findings (add results to Dev Spec)

 

 