Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

The milestone checklist tracks the development tasks that need to be completed prior to moving the Epic or story into a new status

Task

Deliverables

Notes

In Definition > Ready for Review

Complete FIP (if applicable)

  • FIP reviewed and moved to Accepted status

Complete functional / technical design

Design Draft should include a first draft of all elements outlined in the Development Spec.

Ready for Review > Ready for Dev

Design review

  • Functional spec approved by architecture champions and team

Finalize FIP

  • FIP updated with any changes resulting from design review

In Development > Ready for QA

Code complete

  • Code reviewed with dev team (thorough review of modified methods and files)
  • Development Spec updated to reflect the details of the implementation

Performance testing

  • First level performance testing results reviewed with architecture champions (can be performed on dev machine, try to uncover any obvious perf limits)

On feature branch

Unit testing

  • fio.test enhanced with functional tests
  • Tests run cleanly
  • Functional tests well documented (in fio.test) and reviewed with team

On feature branch

In QA > Ready for UAT

Merge to develop and install on DEV

  • Rebase feature branch and merge to develop for UAT testing
  • Install release on DEV server

Feature complete

  • All bugs and outstanding items completed
  • fio.test JS tests completed and run cleanly against DEV server

SDKs

  • Stories created for any needed SDK updates (new getters or actions)
  • SDK dev complete
  • All SDK unit tests run cleanly

https://fioprotocol.atlassian.net/browse/BD-2867

https://fioprotocol.atlassian.net/browse/BD-2858

https://fioprotocol.atlassian.net/browse/BD-2857

In UAT > Ready to Deploy

  • Signoff from Product Management

Ready to Deploy > Devnet

Rollout planning

  • Create rollout/release plan for this effort (added actions, removed actions, table migrations, order dependent detailed instructions on how to roll out these changes successfully. include all necessary MSIGs)
  • Detailed instructions on how to verify that the rollout was performed successfully
  • Review the rollout plan and verification with architecture champions

Testnet > Mainnet

Testnet rollout verification

  • Perform the Testnet rollout verification for the feature and report findings (add results to Dev Spec)

Post-release

Mainnet rollout verification

  • Perform the Mainnet rollout verification for the feature and report findings (add results to Dev Spec)

  •  
  • No labels

0 Comments

You are not logged in. Any changes you make will be marked as anonymous. You may want to Log In if you already have an account.