The milestone checklist tracks the development tasks that need to be completed prior to moving the Epic or story into a new status

Task

Deliverables

Notes

In Definition > Ready for Review

Complete FIP (if applicable)

  •  FIP reviewed and moved to Accepted status

Complete functional / technical design

[FIP-21] FIO Staking Development Spec

Ready for Review > Ready for Dev

Design review

  •  Functional spec approved by architecture champions and team

Finalize FIP

  •  FIP updated with any changes resulting from design review

https://github.com/fioprotocol/fips/blob/master/fip-0021.md

In Development > Ready for QA

Code complete

  •  Code reviewed with dev team (thorough review of modified methods and files)
  •  Development Spec updated to reflect the details of the implementation

SDKs

  •  Stories created for any needed SDK updates (new getters or actions)
  •  SDK dev complete
  •  All SDK unit tests run cleanly
    •  fiosdk_typescript
    •  fiosdk_kotlin

https://fioprotocol.atlassian.net/browse/BD-2983

https://fioprotocol.atlassian.net/browse/BD-2984

https://fioprotocol.atlassian.net/browse/BD-2985

Performance testing

  •  First level performance testing results reviewed with architecture champions (can be performed on dev machine, try to uncover any obvious perf limits)
Unit  

https://fioprotocol.atlassian.net/browse/BD-2988

Action and Getter testing

  •  fio.test enhanced with functional tests
  •  
Tests run cleanly
  • Functional tests well documented (in fio.test) and reviewed with team

In QA > Ready for UAT

Merge to develop and install on DEV

  •  Rebase feature branch and merge to develop for UAT testing
  •  Install release on DEV server

Feature complete

  •  All bugs and outstanding items completed
  •  JS tests completed and run cleanly against DEV server

Develop branch on DEV server

In UAT > Ready to Deploy

  •  Signoff from Product Management

Ready to Deploy > Devnet

Rollout planning

  •  Create rollout/release plan for this effort (added actions, removed actions, table migrations, order dependent detailed instructions on how to roll out these changes successfully. include all necessary MSIGs)
  •  Detailed instructions on how to verify that the rollout was performed successfully
  •  Review the rollout plan and verification with architecture champions

Devnet > Testnet

Devnet testing

  •  addaction and createfee for new actions in fio.devtools
  •  Release to Devnet using
MSIGs
  • contract updates
  •  Perform functional tests on Devnet, review results with team (add results to Dev Spec)
  •  Perform scalability and performance tests on Devnet (add results to Dev Spec)
  •  JS tests completed and run cleanly on Devnet
  •  Devnet fork test
  •  Perform the Testnet rollout verification for the feature and report findings (add results to Dev Spec)
  •  New contract test

https://fioprotocol.atlassian.net/browse/BD-2791

History node testing

  •  Test against node with V1 History and confirm no errors in log file (add results to Dev Spec)

Testnet > Mainnet

Testnet rollout verification

  •  Perform the Testnet rollout verification for the feature and report findings (add results to Dev Spec)

Post-release

Mainnet rollout verification

  •  Perform the Mainnet rollout verification for the feature and report findings (add results to Dev Spec)

  •