The milestone checklist tracks the development tasks that need to be completed prior to moving the Epic or story into a new status

Task

Deliverables

Notes

Github repo

see dev spec (add link)

Project wiki

see devspec (link)

Dev Epic

see epic FIP-41 (add link)

Requirements, Design, and Scoping

Meeting - Kickoff meeting

  •  Kickoff meeting held with Product Manager to review requirements

Complete FIP (if applicable)

  •  FIP reviewed and moved to Accepted status

Complete functional / technical design

Design Draft should include a first draft of all elements outlined in the Development Spec.

Scoping

  •  Create project stories
  •  Estimate stories

Each story should be unit of work that is deliverable in a 2 week sprint. An initial estimate should be included with every story.

Design Review

Design review

  •  Functional spec approved by architecture champions and team

Finalize FIP

  •  FIP updated with any changes resulting from design review

Development

Project management

  •  Maintain a public report that clearly shows:
  • Project milestones

  • Time estimates for reaching project milestones

RAM bumps for new actions

  •  Determine RAM allocation for new actions and set RAM bump accordingly. This informationshould be added to the FIP.

See: https://developers.fioprotocol.io/docs/developers/rammake a link to story here.

RAM usage TRNSLOCTOKS RAM Usage analysis

Fees for new actions

  •  Estimate initial fees for all actions. In cases where the action requires additional RAM, the fees should be correlated with the RAM estimates. This informationshould be added to the FIP.

N/A for this project

Development branches

  •  Project specific development branches created for:
    •  fioprotocol/fio
    •  fioprotocol/fio.contract
    •  fioprotocol/fio.devtools
    •  fioprotocol/fio.test
    •  fioprotocol/fiosdk_typescript

Follow Git branching and naming practices at: https://developers.fioprotocol.io/docs/developers/git

Update FIP (or development document)

  •  FIP / development spec updated to reflect the details of the implementation

ABI validation

  •  Validate json for any new ABIs or ABIs that have been updated
  •  If deploying new contract, make sure ABI copy command is in fio.devtools contracts/build.sh

add story herejson verified in ABI for clrgenlocks

Code review

  •  Code reviewed with dev team

in progress

Unit Testing

Action and getter testing

  •  fio.test enhanced with initial action and getter tests
  •  Tests run cleanly

Performance testing

  •  First level performance testing results reviewed with architecture champions (can be performed on dev machine, try to uncover any obvious perf limits)

in progress add story

System testing

  •  Tests passed to QA for system testing

UAT

Merge to develop and install on DEV

  •  Rebase feature branch and merge to develop for UAT testing
  •  Install release on DEV server

Feature complete

  •  All bugs and outstanding items completed
  •  Work with QA to confirm JS tests run cleanly against DEV server

Product signoff

  •  Signoff from Product Management

Release Plan

Rollout planning

  •  Create rollout/release plan for this effort (added actions, removed actions, table migrations, order dependent detailed instructions on how to roll out these changes successfully. include all necessary MSIGs)
  •  Detailed instructions on how to verify that the rollout was performed successfully
  •  Review the rollout plan and verification with architecture and QA/Integration teams

in progress

Devnet

Devnet testing

  •  Work with release engineer to fully test any new contracts and actions.

Devnet testing is tracked in the Release Milestone Checklist

Testnet

Test planning

  •  Work with release team to ensure correct Testnet rollout (addaction, setfee, contract updates, etc).

See Release Milestone Checklist

Testnet rollout verification

  •  Perform the Testnet rollout verification for the feature and report findings (add results to Dev Spec)

Mainnet

Test planning

  •  Work with release team to ensure correct Mainnet rollout (addaction, setfee, contract updates, etc).

See Release Milestone Checklist

Mainnet rollout verification

  •  Perform the Mainnet rollout verification for the feature and report findings (add results to Dev Spec)

...