Task

Deliverables

Notes

Kickoff

Github repo

  •  project/<projectname> created (Dev Director)

Project wiki

  •  Project wiki created (Dev Director)

Epic

  •  Epic created for project (Dev Director)

https://fioprotocol.atlassian.net/browse/BD-1719

Requirements, Design, and Scoping

Kickoff meeting held with Product Manager to review requirements

  •  Kickoff meeting

Complete FIP (if applicable)

  •  FIP reviewed and moved to Accepted status

N/A

Complete functional / technical design

Design Draft should include a first draft of all elements outlined in the Development Spec.

Scoping

  •  Create project stories
  •  Estimate stories

Each story should be unit of work that is deliverable in a 2 week sprint. An initial estimate should be included with every story.

Design Review

Design review

  •  Functional spec approved by architecture champions and team

Finalize FIP

  •  FIP updated with any changes resulting from design review

Development

Scoping

  •  Create project stories
  •  Estimate stories
  •  Create project tracking wiki page (Dev Director)

Each story should be unit of work that is deliverable in a 2 week sprint. An initial estimate should be included with every story.

Development

  •  Ongoing scrum and progress checkpoints during development

These will be scheduled by the development director

Code complete

  •  Development branch created and initial merge completed
    •  fioprotocol/fio
    •  fioprotocol/fio.contract
  •  Code reviewed with dev team (thorough review of modified methods and files)
  •  Development Spec updated to reflect the details of the implementation
  •  Validate json for any new ABIs or ABIs that have been updated

SDKs

  •  Stories created for any needed SDK updates (new getters or actions)
  •  SDK dev complete
  •  All SDK unit tests run cleanly
    •  fiosdk_typescript
    •  fiosdk_kotlin

Unit Testing

Unit testing

  •  fio.test enhanced with functional tests
  •  Tests run cleanly
  •  Functional tests well documented (in fio.test) and reviewed with team

On project branch

Performance testing

  •  First level performance testing results reviewed with architecture champions (can be performed on dev machine, try to uncover any obvious perf limits)

On project branch

System testing

  •  Tests passed to QA for system testing

UAT

Merge to develop and install on DEV

  •  Rebase feature branch and merge to develop for UAT testing
  •  Install release on DEV server

Feature complete

  •  All bugs and outstanding items completed
  •  JS tests completed and run cleanly against DEV server

Develop branch on DEV server

  •  Signoff from Product Management

Release Plan

Rollout planning

  •  Create rollout/release plan for this effort (added actions, removed actions, table migrations, order dependent detailed instructions on how to roll out these changes successfully. include all necessary MSIGs)
  •  Detailed instructions on how to verify that the rollout was performed successfully
  •  Review the rollout plan and verification with architecture and QA/Integration teams

Devnet

Devnet testing

  •  Work with QA/Integration to complete devnet testing
  •  Validate Devnet test results

Testnet

Test planning

  •  Work with release team to ensure correct Testnet rollout (addaction, setfee, contract updates, etc).

See Release Milestone Checklist

Testnet rollout verification

  •  Perform the Testnet rollout verification for the feature and report findings (add results to Dev Spec)

Mainnet

Test planning

  •  Work with release team to ensure correct Mainnet rollout (addaction, setfee, contract updates, etc).

See Release Milestone Checklist

Mainnet rollout verification

  •  Perform the Mainnet rollout verification for the feature and report findings (add results to Dev Spec)

...